Extension Planning Permission in Ireland: the 40 m² Rule Is Now 45 m²
The rules as they stand since 27 July 2026, from Citizens Information, gov.ie and the councils. General information, not planning advice.
The short answer. Since 27 July 2026 you can extend the back of your house by up to 45 square metres without planning permission, provided the extension is no higher than the house, leaves at least 25 square metres of private open space behind it, and meets the height, window and roof conditions in the regulations. The 45 m² is a lifetime total for the house, so any earlier extension counts against it. Two-storey extensions are never exempt. Side and rear dormers up to 30 cubic metres became exempt on the same day. And the building-control threshold stayed at 40 m², so an extension between 41 and 45 m² skips planning but still needs a Commencement Notice. This page is general information, not legal advice; check with your council before relying on any exemption.
What Changed on 27 July 2026
The Planning and Development (Exempted Development) Regulations 2026 amended the 2001 regulations in seven instruments, and they came into force on Monday 27 July 2026. For anyone extending a house, three changes matter.
The rear-extension limit went from 40 m² to 45 m². This is the one everybody asks about, and most of the internet has not caught up. If you searched "40 square metre extension" and landed here, the number you want is now 45.
Dormers to the side or rear became exempt, within a volume limit, for the first time. Until July an attic conversion with a dormer nearly always meant a planning application. Now many do not.
Garages, porches and outbuildings had their limits nudged upward, and a separate new exemption lets you build a small detached home in the back garden until the end of 2030. That last one is a different kind of project from an extension and we do not cover it here.
The 45 m² Rule and Its Conditions
The exemption covers an extension to the rear of the house. To qualify, the extension must:
- Not bring the total extended floor area above 45 m². The total includes every extension ever added to the house, including ones that had planning permission at the time. A house extended by 20 m² in 2005 has 25 m² of exemption left, not 45.
- Be no higher than the house.
- Leave at least 25 m² of private open space at the back of the house for the use of the people who live there. On a short garden this condition, not the 45 m², is often the one that bites.
- Meet the detailed rules on height, window placement and how the roof is used. These exist and they are specific; Citizens Information names them without quoting them, and neither do we. Your designer or the council will check them against your drawings.
If the extension is above ground floor there are tighter limits again: it must be at least 2 metres from any boundary, and its floor area must not exceed 12 m² on a terraced or semi-detached house or 20 m² on a detached house. In practice that rules out most first-floor rear extensions on Dublin semis, which is why two-storey work goes through planning.
What Is Never Exempt
Two-storey extensions. A full two-storey rear or side extension does not fit inside the above-ground-floor limits, so it needs a planning application. Budget eight to twelve weeks for the decision and an architect's fee for the drawings.
Front extensions. Anything that projects forward of the front wall of the house, other than a small porch, needs permission.
Most side extensions. The exemption is written around the rear of the house. A side extension that can be seen from the road generally needs a planning application, and a side extension that runs along a boundary usually fails the boundary distance in any case.
Anything that takes the total past 45 m². Once you are over, the whole extension needs permission, not just the excess.
Anything on a protected structure or in an Architectural Conservation Area that the council decides would affect the character of the building or the area. More on that below.
The New Dormer Exemption
Since 27 July 2026 you can add a dormer roof extension and dormer window to the side or rear of the house without permission if the dormer is no more than 30 cubic metres, including any dormer already on the roof, sits no higher than the top of the existing roof, and stays at least 20 centimetres in from the edge of the roof. A dormer to the front of the house still needs planning permission.
For attic conversions in Dublin this is the change that matters. A modest rear dormer that gives an attic room its head height and a proper window can now be built without a planning application on most houses, which takes two to three months off the timeline. Our attic conversions page covers what else an attic needs to become a habitable room, because planning is only one of the tests.
Garages and Porches
Converting an attached garage at the back or side of the house to living space is exempt if the garage floor area is under 45 m². Converting it to a business use is a change of use and is not exempt. See garage conversions.
A front porch is exempt up to 2 square metres, provided it is more than 2 metres from any public road or footpath and no higher than 4 metres with a tiled or slated pitched roof, or 3 metres with any other roof.
A detached garage, shed or garden building at the back or side is exempt up to 30 square metres in total, with the same 4-metre and 3-metre roof-height rules, provided it does not project forward of the front of the house and leaves the 25 m² of open space.
The Building-Control Gap: 41 to 45 m²
This is the part almost nobody writes about, and it is the part that catches people.
Planning permission and building control are two separate systems. Planning decides whether you are allowed to build it. Building control, under the Building Control (Amendment) Regulations 2014, decides how the build is certified. The building-control threshold for a house extension is 40 square metres, and the July 2026 regulations did not touch it.
So an extension of 40 m² or less needs neither a planning application nor a Commencement Notice under the statutory certification system. An extension over 40 m², whether it is planning-exempt or not, needs a Commencement Notice lodged with the building control authority before work starts, and a decision about certification: either you appoint an Assigned Certifier (a registered architect, engineer or building surveyor) to inspect and certify the work, or you sign an opt-out declaration taking responsibility for compliance with the Building Regulations yourself. There is a small fee for lodging the notice.
The consequence of the 45 m² rule, then, is a band between 41 and 45 m² that is exempt from planning but inside building control. If you are designing to the new limit, budget for the Commencement Notice and the certification decision. Our planning your extension guide explains who does what.
Protected Structures and Conservation Areas
The exemptions above do not apply cleanly to a protected structure or to a house inside an Architectural Conservation Area (ACA). The regulations restrict works that would materially affect the character of a protected structure, and each council's development plan sets out what it treats as affecting the character of an ACA. Dublin City Council, Dún Laoghaire-Rathdown, Fingal, South Dublin, Wicklow, Kildare and Meath each keep a Record of Protected Structures and a list of ACAs, and the older parts of the city (the red-brick Victorian and Edwardian districts especially) are where you are most likely to be inside one.
If your house is listed, or you are not sure whether your street is in an ACA, find out before you spend money on drawings. The council's planning search will tell you, and the answer changes what "exempt" means for your house.
Asking the Council for a Formal Answer
If there is any doubt about whether your extension is exempt, you can ask the planning authority for a formal written declaration on the question under Section 5 of the Planning and Development Act 2000. There is a fee and a waiting period, and the answer is binding on the council. For a straightforward 30 m² rear extension it is rarely necessary; for anything near the limits, on a corner site, on a protected structure or in an ACA, it is cheap insurance against a stop notice halfway through the build.
Who Your Planning Authority Is
Dublin has four planning authorities, not one, and the commuter belt adds three more:
- Dublin City Council — the city inside the canals and the older suburbs on both sides of the Liffey, including Clontarf, Terenure and Donaghmede.
- Fingal County Council — the north county: Swords, Malahide, Portmarnock, Howth, Skerries, Balbriggan, and Dublin 15 (Castleknock, Blanchardstown).
- South Dublin County Council — Tallaght, Clondalkin, Lucan and most of Rathfarnham.
- Dún Laoghaire-Rathdown County Council — Dún Laoghaire, Stillorgan, Dundrum and the south-east county.
- Wicklow County Council — Bray and Greystones.
- Kildare County Council — Naas, Maynooth, Celbridge and Leixlip.
- Meath County Council — Ashbourne and Dunboyne.
The exemption rules are national and identical in all seven. What differs is the development plan, the ACA list and how each council interprets the character tests, so the address decides who you ask.
What This Means for Your Extension
If you are planning a single-storey rear extension of up to 45 m² on an ordinary Dublin semi or terrace with a reasonable garden, and the house has not been extended before, you can very probably build it without a planning application. Confirm the open-space and height conditions against your drawings, decide how you will handle certification if it is over 40 m², and check the protected-structure and ACA position for your street.
If you want two storeys, a front extension, a side extension visible from the road, or you have already used part of the allowance, plan for a planning application from the start and let the timeline reflect it.
This page describes the regulations as they stand at the date above, in general terms. It is not legal or planning advice. Your architect, architectural technologist or engineer, and the planning authority for your address, are the people who can confirm what applies to your house.
Tell us what you have in mind and we will pass it to a Dublin building contractor who can price it.
Get a Free Extension Quote
When you are ready, your enquiry goes to an independent building contractor who covers your part of Dublin.