House Extensions Dublin

House Extension FAQs

Free, no-obligation extension quotes across Dublin, Kildare, Meath and north Wicklow.

House Extension Questions, Answered

What is the average cost of a house extension in Ireland?

It depends on size, storeys, structure, ground, glazing and finish, so the honest answer is a range rather than an average. We keep every figure on the site on one page, with researched 2026 Dublin ranges by extension type and two worked examples: house extension cost.

How much is a 40 square metre extension?

The first thing to know is that the planning exemption is now 45 square metres, not 40, since 27 July 2026, so you may be able to build a little more than you planned. The cost of a 40 to 45 m² extension is worked through line by line in our cost guide, including the building-control paperwork that applies above 40 m².

How much roughly is a two-storey extension?

Per square metre, a two-storey extension is usually the best value you can build, because the foundations, roof and scaffold are shared. In total it is the largest project on this site. The cost guide gives the 2026 range and the typical uplift over a single storey.

How big can an extension be without planning permission in Ireland?

Since 27 July 2026: up to 45 square metres to the rear, as a lifetime total for the house including any earlier extension, provided it is no higher than the house, leaves at least 25 m² of private open space behind it, and meets the height, window and roof conditions. Two-storey extensions are never exempt. Side and rear dormers up to 30 m³ are now exempt too. Full detail, including protected structures and conservation areas: extension planning permission.

What is the cheapest way to extend a house?

Convert what you already have. An attached garage is the cheapest room a Dublin house can gain, and an attic conversion adds a bedroom without a metre of new foundations. After those, a plain single-storey rear extension with a builder's finish, standard glazing and no kitchen relocation is the cheapest new floor area. See garage conversions and attic conversions.

Do I need an architect for an extension?

You need drawings, and for anything that opens up the back wall you need a structural engineer. The drawings can come from an architect or, for straightforward work, an architectural technologist. Our planning your extension guide explains who does what and in which order.

How long does a house extension take?

Drawings, four to eight weeks. Planning, if needed, eight to twelve. Engineering and quotes, two to four. Then the wait for a good builder to start, which in Dublin is often two to four months. The build itself, ten to sixteen weeks for a single-storey extension. An idea in January is often a finished room in the autumn.

Are you a building company? Who does the work?

No, we are an enquiry service. Your details go to an independent Dublin building contractor who does the kind of work you described, and they quote you direct. We do not do the building, we do not inspect it, and we do not claim to have checked anyone; we show you how to check a builder yourself in the guide above. We may be paid for the introduction; see our referral marketing disclosure.

Do you cover detached garden buildings, or the new back-garden home exemption?

No. Detached buildings at the bottom of the garden, including the new exemption for a small detached home built between 2026 and 2030, are a different kind of project with their own rules and trades, and we do not take those enquiries. We cover extensions attached to the house.

Can I build an extension for twenty thousand?

We keep euro figures on one page, so the honest answer is on the cost guide. In short: a new-build extension of any real size does not come in at that level in Dublin in 2026 once the opening, the drains, the glazing and VAT are counted. What can: converting an attached garage, or a rooflight attic conversion where the head height already exists. See garage conversions and house extension cost.

Will an extension add value to my house?

Usually, and a well-built kitchen-diner or an extra bedroom is the kind of space Dublin buyers pay for. Whether it adds more than it costs depends on the house, the street and how long you stay; an extension you will live in for fifteen years does not need to pay for itself on day one. What reliably subtracts value is an extension without a completion certificate, without planning where planning was needed, or built to a standard the next surveyor can see through. That is why we keep going on about drawings and paperwork.

What happens on the site visit?

The builder looks at the back of the house, the garden, the side access, where the drains and the meters are, and the wall you want to open. They ask what you want the room for and what finish you have in mind. If you have drawings they price them; if not, they tell you what drawings they need. Nobody from House Extensions Dublin attends, and there is no sales pitch from us before or after.

Is this hair extensions?

No. The search term is a shared one, and if you were looking for a salon you are on the wrong site. We build rooms.

Get a Free Extension Quote

One enquiry, one independent building contractor, and their own quote for your house.

We are a house extension enquiry service. We pass your enquiry to an independent Dublin building contractor and they quote you direct. We do not carry out building work, and we do not inspect or approve the contractor who does. How we make money.