House Extensions in Celbridge, Co. Kildare
Celbridge is 1970s to 2000s estates on the Liffey with an eighteenth-century main street, and the rear kitchen extension on an estate semi is the job that comes up most. Tell us what you want to build.
Extending a House in Celbridge
Celbridge's housing is largely estate semis and detached houses built from the 1970s to the 2000s on the roads out of the town, with a smaller stock of older houses along the Georgian main street and near the demesne. The 1970s and 1980s houses often have an attached garage and a garden deep enough for a rear extension of twenty to thirty square metres inside the exemption; the 2000s estates have shorter plots where the 25 m² open-space condition decides the depth. The kitchen-diner extension is the standard enquiry, the garage conversion the second, and the two are often one contract. The main street is one of the finest Georgian streets in the country and carries conservation constraints; a protected-structure check is essential before any drawings there. Kildare County Council is the planning authority. Side access on the estates is usually good.
Planning in Celbridge: Your Authority Is Kildare County Council
The planning authority for Celbridge is Kildare County Council. The exemption rules are national and the same everywhere in Ireland; what Kildare County Council decides is the development plan, the list of Architectural Conservation Areas and protected structures, and how the character tests are applied on your street.
Since 27 July 2026 a rear extension of up to 45 square metres, as a lifetime total for the house, can be built without a planning application provided it is no higher than the house, leaves at least 25 m² of private open space behind it and meets the height, window and roof conditions in the regulations. A two-storey extension always needs permission. Above 40 m² the extension also needs a Commencement Notice under building control before work starts, whether or not it needed planning. On the estate housing in Celbridge the condition that usually decides how far you can go is not the 45 m² but the 25 m² of open space that must remain behind the extension. Measure the garden first.
Our extension planning permission guide sets out the rules as they stand and how to ask Kildare County Council for a formal answer if there is any doubt.
What Changes the Price of an Extension in Celbridge
There is no price list on this page. A figure taken off a website is almost never the figure you end up paying, and the honest thing is to explain what moves an extension quote in Celbridge so you can read the ones you get.
The plot comes first. How deep the garden is decides how far you can extend and still leave the 25 m² of open space the exemption requires; how wide the side passage is decides whether a mini-digger and a skip can get to the back or whether everything comes through the house. Two houses on the same road in Celbridge can be very different jobs for that reason alone.
Then what is under the ground. Drains that run where the extension goes, an ESB cable under the lawn, tree roots, or ground that was filled when the estate was built: none of it shows on a sketch, and all of it shows in the price.
Then the back wall. Nearly every kitchen extension opens up the existing back wall, which means a steel beam and a structural engineer to design it. How wide the opening is, and whether the beam can be hidden, are design decisions with a cost attached.
Then the glass and the finish. Sliding doors and a lantern are the biggest single line after the shell, and the gap between a builder's finish and a turnkey room with floor, kitchen and lighting is where two quotes for the same drawings come back far apart.
And whether you have drawings at all. A builder pricing a proper set of drawings gives a price you can hold them to. A builder pricing a conversation gives an estimate, and the difference appears later as extras.
If you want real figures before you speak to anyone, our house extension cost guide sets out researched 2026 Dublin ranges by extension type with two worked examples.
Extension Services in Celbridge
Most enquiries from Celbridge are kitchen extensions: the back wall opened up, a few metres added, and a kitchen-diner where a small kitchen and a separate dining room used to be. Those are the jobs where getting the drains and the steel drawn before the slab is poured matters most.
All six are available in Celbridge:
- single-storey extensions — rear, side, wrap-around and side return; the one most likely to fit the 45 m² exemption
- kitchen extensions — the steel, the glass and the services, then the kitchen
- two-storey extensions — downstairs and upstairs on one set of foundations
- attic conversions — a bedroom in the roof, with rear dormers now exempt on most houses
- garage conversions — an attached garage made into a warm room
- sunroom extensions — a glazed room built to be lived in all year
How It Works
House Extensions Dublin is an enquiry service, not a building company, and that deserves saying clearly.
You tell us about the job. Call or use the form. Rear, side, two-storey, attic, garage or sunroom; roughly how big; whether you have drawings. It takes about a minute.
It goes to a Dublin building contractor. An independent builder who works in Celbridge and the surrounding area gets your details and what you have told us.
They contact you themselves. They arrange a visit and a quote. After that it is between you and the builder, and you can say no at any point.
No building work is done by us, and the contractor who does it is not inspected or approved by us. Our part is sparing you the phone calls, and handing you the questions that turn a builder's quote into something you can read. Our guide to planning your extension has the checks.
Nothing is charged and nothing is owed. If you get in touch outside working hours, you will hear back the next working day.
Extension Quotes in Celbridge
Tell us what you want to build in Celbridge. A contractor who works the area visits and quotes you direct; there is no fee and nothing to sign.
