Two-Storey Extensions in Dublin
A two-storey extension adds a room downstairs and a room upstairs on one set of foundations and one roof, which is why it is the best value per square metre of anything you can add to a house, and why it is also the largest single building project most families ever take on. Tell us what you are thinking of and we will pass it to an independent Dublin building contractor who has built them.
What a Two-Storey Extension Usually Is
Over the kitchen. The commonest version on a Dublin semi: a rear extension at ground level with a bedroom or bathroom above it, often replacing a single-storey flat-roofed kitchen from the 1970s that has reached the end of its life. It gives the house a fourth bedroom and a family kitchen in one project.
To the side. On a semi with a wide passage or a detached house with room beside it, a two-storey side extension adds a room on each floor along the full depth of the house. It changes the front elevation, which is why it always goes through planning.
Two-storey on a bungalow. A bungalow with a good plot can take a two-storey rear extension that turns it into something closer to a house, or a dormer conversion of the roof combined with a rear extension. The first is a two-storey extension in planning terms; the second is often an attic conversion plus a single-storey extension, and the difference matters for what is exempt. See attic conversions for the roof side.
Wrap-around and full-width. On larger detached houses in Castleknock, Malahide or the Kildare commuter towns, a two-storey extension can run the full width of the back of the house. These are architect-led projects and priced as such.
Planning: Two Storeys Are Never Exempt
The planning exemption for house extensions is written around the rear of the house at ground level. An extension above ground floor has to sit at least 2 metres from any boundary and is limited to 12 m² on a semi or terrace and 20 m² on a detached house, which rules out any real two-storey extension on any real Dublin house. A two-storey extension needs a planning application. Plan for eight to twelve weeks from a valid application to a decision, and for the architect's fee that goes with it.
Because a two-storey extension is also nearly always over 40 m² in total, it is inside the Building Control (Amendment) Regulations as well: a Commencement Notice before work starts and a decision about an Assigned Certifier or an opt-out. Our extension planning permission guide sets out both systems and what changed on 27 July 2026; our planning your extension guide explains who does what.
Terraces, Neighbours and Light
On a terraced or semi-detached house, a two-storey extension sits against a party wall and rises past a neighbour's windows. Two things to settle early:
The party wall. Work to a shared wall, or foundations close to it, needs your neighbour's agreement and usually a written arrangement about access and making good. Get it before the planning application, not after, because an objection at planning is far harder to deal with than a conversation over the fence.
Daylight and overlooking. The planning authority will look at the effect on the neighbour's light and privacy. A two-storey rear extension on a terrace is often set back from the boundary or stepped in at first-floor level for exactly that reason, and a good architect designs for it from the first sketch.
Structure
A two-storey extension is a small house attached to a larger one. It needs its own foundations designed for the ground it sits on, a structural design for the opening into the existing house on both floors, and a roof that meets the existing roof without creating a valley that will leak in ten years. On a bungalow, the existing walls may not be built to carry a second storey at all, which is a survey question before it is a design question. The structural engineer is not optional on this job.
What Changes the Price
No figures on this page; the number depends on your house. What moves it:
Two floors on one footprint is cheaper per square metre than two separate extensions, because the foundations, the roof and the scaffold are shared. It is still the largest project on this site in total.
How the existing house has to change. Opening the back wall on two floors, rerouting a bathroom, moving a staircase landing: work inside the old house often costs as much as the new room.
The roof junction. A two-storey extension whose roof runs into the existing roof is more engineering and more leadwork than one with its own hipped roof clear of it.
Planning and design fees. An architect's drawings, the planning application, the engineer, and on most two-storey jobs an Assigned Certifier.
Finish. A bedroom and an en-suite upstairs, a kitchen downstairs: the fit-out on a two-storey extension can be a large share of the total.
Living through it. A two-storey extension usually means weeks without a kitchen and a bedroom out of use. Some families move out for part of the build; that is a cost too.
For researched 2026 Dublin ranges, including the typical uplift for a second storey, see our house extension cost guide.
How It Works
You tell us the job. Over the kitchen, to the side, on a bungalow; roughly what size; whether you have drawings and where planning stands.
It goes to a Dublin building contractor. An independent builder who works in your area and has built two-storey extensions.
They contact you and quote. A site visit, a price against the drawings, and a conversation about programme. From there it is between you and them.
We do not do the building and we do not inspect the builder. If you get in touch outside working hours, you will hear back the next working day.
Related Services
If the upstairs room is really an attic room, see attic conversions. If a single storey would do, single-storey extensions is the cheaper route and often the exempt one. If the downstairs room is a kitchen, kitchen extensions covers the services and structure that go with it.
Areas
Two-storey extensions across Castleknock, Malahide, Howth, Rathfarnham, Dundrum, Stillorgan, Dún Laoghaire, Naas, Maynooth, Greystones and every other area we cover. see all service areas
Common Questions
Does a two-storey extension need planning permission in Ireland?
Yes, in every realistic case. The above-ground-floor exemption is too small and too tightly bounded to cover one.
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations, roof and scaffold are shared. In total it costs more, and it is a bigger disruption.
Can I add a second storey to a bungalow?
Sometimes. It depends on whether the existing walls and foundations can carry it, which is a structural survey question, and on planning. A dormer conversion of the roof is often the more practical route.
Get a Free Quote for Two-Storey Extensions
Say where the house is and what you want to build. An independent building contractor who covers your part of Dublin visits, quotes and deals with you direct.